Summary
The Brief: Johns Associates was appointed to lead the environmental appraisal of the project and to act as planning agent. As the scheme evolved this led to a significant input into the design process. The project was conceived with the support of the canal owner and operator and is seeking to unlock benefits to
Read Entire Case Study
Summary
The Brief: Prepared on behalf of a local community group, the brief was to produce restoration proposals for a stretch of neglected urban waterway. Our Role: Johns Associates designed and prepared a comprehensive restoration masterplan in order to facilitate the coordination of future projects within the scheme, as well as forming a tool to secure
Read Entire Case Study
Summary
The brief: To develop and implement the restoration of Fleet Pond Site of Special Scientific Interest (SSSI). Our role: Johns Associates provided a multi-disciplinary project team of hydrologists, geomorphologists, landscape architects, planners, contractors and ecologists We produced a £1500 feasibility study to secure £1,000,000 from Natural England, the Environment Agency, Hart District Council and Fleet Pond
Read Entire Case Study
Summary
The Brief: We were appointed to prepare a flood risk management scheme for a private house and garden that was experiencing regular flooding due to its proximity to a watercourse. Our role: We suggested a range of measures for the protection of the house, including construction of a floodwall and removable floodgates To compensate for
Read Entire Case Study