Case Studies: Planning

Case Study: Property development feasibility appraisal

Wilts

Client: Local Authority, West England

Services: ,

Summary

The Brief: Our client, the property development function of a Local Authority was seeking to develop land within its ownership to meet a social need by providing sheltered and assisted living accommodation and increase the stock of affordable housing available. Our Role: Johns Associates undertook an initial desktop study using a combination of data provided

Read Entire Case Study

Case Study: Abberd Brook

AbberdBrookCaseStudyImage (2)

Client: Local Community Group

Services: , , ,

Summary

The Brief: Prepared on behalf of a local community group, the brief was to produce restoration proposals for a stretch of neglected urban waterway. Our Role: Johns Associates designed and prepared a comprehensive restoration masterplan in order to facilitate the coordination of future projects within the scheme, as well as forming a tool to secure

Read Entire Case Study

Case Study: Fleet Pond Restoration

Pretty long shot of lake

Client: Hart District Council, The Environment Agency, Natural England and Fleet Pond Society

Services: , , , , ,

Summary

The brief:   To develop and implement the restoration of Fleet Pond Site of Special Scientific Interest (SSSI). Our role: Johns Associates provided a multi-disciplinary project team of hydrologists, geomorphologists, landscape architects, planners, contractors and ecologists We produced a £1500 feasibility study to secure £1,000,000 from Natural England, the Environment Agency, Hart District Council and Fleet Pond

Read Entire Case Study

Case Study: Phase 1 Habitat Survey

shutterstock_139595354

Client: Ralph Allen School

Services: ,

Summary

The brief:  Johns Associates were commissioned to undertake an Ecological Impact Assessment (EcIA) of the proposed Applied Learning Centre and All-Weather Pitch at Ralph Allen School in Combe Down, Bath. Our role: We completed a desk study, extended Phase 1 Habitat Survey and bat activity survey The bat survey identified that very small numbers of greater and

Read Entire Case Study

Case Study: Flood risk management

Semmington small

Client: Private householder

Services: , ,

Summary

The Brief:  We were appointed to prepare a flood risk management scheme for a private house and garden that was experiencing regular flooding due to its proximity to a watercourse. Our role: We suggested a range of measures for the protection of the house, including construction of a floodwall and removable floodgates To compensate for

Read Entire Case Study